Today we will delve into Dubai Towers Doha, a topic that has captured the attention of many in recent times. Dubai Towers Doha is something that has generated great interest in different areas, from science to pop culture. Over the years, Dubai Towers Doha has been the subject of study, debate and reflection, and its relevance is still present today. In this article we will explore different aspects related to Dubai Towers Doha, from its origins to its impact on modern society. We'll dive into the history and meaning of Dubai Towers Doha, as well as its implications in various contexts. Prepare to enter a fascinating and intriguing universe, full of knowledge and discoveries about Dubai Towers Doha.
Dubai Towers Doha | |
---|---|
أبراج دبي الدوحة | |
General information | |
Status | Under construction |
Type | Hotel, office, residential, restaurant, retail |
Architectural style | Futurism, glass |
Location | Corniche Street, West Bay, Doha, Qatar |
Coordinates | 25°18′52″N 51°31′20″E / 25.31444°N 51.52222°E |
Construction started | June 18, 2007 |
Construction stopped | November 12, 2010 |
Estimated completion | 2027 |
Cost | 2.3 Billion Qatari riyal 620 million USD[citation needed] |
Height | |
Antenna spire | 437.1 m (1,434 ft) |
Roof | 400.0 m (1,312.3 ft) |
Top floor | 400 m (1,312.3 ft) |
Technical details | |
Floor count | 91 |
Design and construction | |
Architect(s) | RMJM Architect of Record : Diwan Al Emara |
Developer | Sama Dubai (Dubai International Properties) |
Main contractor | Al Habtoor-Al Jaber Joint Venture |
Dubai Towers - Doha is a super-tall skyscraper with a roof height of 400 m (1,300 ft) (spire height 437 m (1,434 ft)) developing in Doha, Qatar. The estimated cost of Dubai Towers - Doha is 2.3 billion Qatari Riyal (US$620 million)[citation needed]. When completed, the structure will be the tallest building in Qatar.
Located in the West Bay district of Doha, next to the Doha Corniche, the 90-story multi-use tower is being developed by Sama Dubai, formerly known as Dubai International Properties, the international real estate investment and development arm of Dubai Holding.
The project has been contracted to a joint venture between Al-Habtoor and Al Jaber, while Robert Matthew Johnson Marshall (RMJM) are the architects and engineering consultants. The cost consultants are Hanscomb Consultants Inc. The Project Management consultant is Sama ECH.
When completed the mixed use tower will include a 7,000 m2 (75,000 sq ft) retail area, 13 floors comprising a 225-room five-star hotel, 29 floors of office space and 31 floors containing 226 luxury apartments and three super luxury penthouses.
The project is now severely delayed as a result of the financial crash in Dubai. Investors in the property have been advised that the building is 9 months behind schedule. By May 2010 only 29 of the proposed 84 stories had been built. At that building rate, this would suggest at least another 11-year delay until completion.
In February 2022, a few floors have been cladded in dirty glass.