Incubation Park station

In this article, the topic of Incubation Park station will be addressed from different perspectives, analyzing its importance, impact and relevance in today's society. Various aspects related to Incubation Park station will be explored, as well as its implications at a social, cultural, economic and political level. Throughout the article, different opinions and points of view will be presented, with the aim of offering a comprehensive and enriching vision about Incubation Park station. In addition, possible solutions and initiatives will be examined to address the challenges that Incubation Park station poses, in order to encourage dialogue and reflection around this topic.

Incubation Park

孵化园
Chengdu Metro
General information
LocationWuhou District, Chengdu, Sichuan
China
Coordinates30°34′42″N 104°03′39″E / 30.5783°N 104.0609°E / 30.5783; 104.0609
Operated byChengdu Metro Limited
Line(s)     Line 1
     Line 9
     Line 18
Platforms6 (2 island platforms, 2 side platforms)
Construction
Structure typeUnderground
Other information
Station code01 16, 09 03, 18 06
History
Opened27 September 2010 (Line 1)
27 September 2020 (Line 18)
18 December 2020 (Line 9)
Services
Preceding station Chengdu Metro Following station
Financial City
towards Weijianian
Line 1 Jincheng Plaza
Xindao Line 9 Jincheng Avenue
towards Huangtianba
South Railway Station
Terminus
Line 18 Jincheng Plaza East

Incubation Park (Chinese: 孵化园) is a station on Line 1, Line 9 and Line 18 of Chengdu Metro in China.

Station layout

G Entrances and Exits Exits A-C, F-H, J
B1 Concourse Faregates, Station Agent
B2 Northbound      Line 1 towards Weijianian (Financial City)
Side platform, doors open on the left (Northbound trains only)
Southbound      Line 1 towards Science City (Jincheng Plaza)
Side platform, doors open on the right
B3 Northbound      Line 9 towards Huangtianba (Jincheng Avenue)
Island platform, doors open on the left
Southbound      Line 9 towards Financial City East (Xindao)
B4 Northbound      Line 18 towards South Railway Station (Terminus)
Island platform, doors open on the left
Southbound      Line 18 towards Sancha (Jincheng Plaza East)

Gallery

References

  1. ^ "运行线路图". Chengdu Metro. Archived from the original on 22 August 2010. Retrieved 14 August 2020.
  2. ^ "Operated lines". Chengdu Metro. Retrieved 14 August 2020.