Today, Lurie Biomedical Engineering Center is a topic of great importance and interest for a wide spectrum of the population. As our society evolves and faces new challenges, the theme of Lurie Biomedical Engineering Center becomes a focal point for reflection and action. It is a topic that is present in all areas of life, from politics to pop culture, through technology and science. In this article, we will explore different aspects of Lurie Biomedical Engineering Center and its impact on our current society. We will address different perspectives, opinions and research findings to shed light on this topic that is so relevant in the contemporary world.
Ann and Robert H. Lurie Biomedical Engineering Building | |
---|---|
General information | |
Location | Ann Arbor, Michigan, United States |
Coordinates | 42°17′19.70″N 83°42′48.68″W / 42.2888056°N 83.7135222°W |
Construction started | 2004 |
Completed | 2006 |
Opening | August 2006 |
Design and construction | |
Architect(s) | ZGF Architects |
Engineer | KPFF Consulting Engineers |
Main contractor | Skanska |
The Ann and Robert H. Lurie Biomedical Engineering Building officially opened in August 2006. It was part of an expansion of the University of Michigan Biomedical Engineering Department (BME). The building houses researchers previously spread through several different University of Michigan campus locations.
The project consists of 31,670 sq ft (2,942 m2) of new construction in the form of an addition, with 23,370 sq ft (2,171 m2) of renovated space in an existing building. Programs in the facility emphasize cellular and molecular biotechnologies. The addition contains research laboratory and support space. The renovation provides wet and dry teaching labs, classrooms, a computer classroom, support spaces, conference rooms, meeting rooms, faculty offices, a kitchen, and clerical support spaces.