Sherbino Wind Farm

In today's world, Sherbino Wind Farm is a topic that has gained great relevance and interest. Whether it's its impact on society, its historical relevance, or its influence on popular culture, Sherbino Wind Farm has captured the attention of people of all ages and backgrounds. In this article, we will explore this fascinating phenomenon in depth, analyzing its many facets and its evolution over time. From its importance in daily life to its significance in broader areas, Sherbino Wind Farm has left an indelible mark on today's world, and deserves to be examined and understood in all its complexity.

Sherbino Mesa Wind Farm
Map
CountryUnited States
LocationPecos County, Texas
Coordinates30°48′39.6″N 102°21′43.2″W / 30.811000°N 102.362000°W / 30.811000; -102.362000
StatusDecommissioned
Decommission date
  • January 2021
Wind farm
Type
Power generation
Units operational110
Make and modelVestas V-90, Clipper Windpower C-96
Nameplate capacity300 MW

The Sherbino Mesa Wind Farm is located in Pecos County in west Texas. The first 150 megawatts (MW) of the project, which has a potential capacity of 750 MW, is in operation. Phase I utilizes 50 Vestas V-90 Mk.5 wind turbine generators, each with a rated capacity of 3 MW. BP will operate phase I of the project.

Phase II, located on a 20,000-acre (8,100 ha) site 40 miles (64 km) west of Fort Stockton, utilizes 60 Clipper Windpower C-96 wind turbines, each with a rated capacity of 2.5 MW. This phase will be in operation by the end of 2011.[needs update]

See also

References