In this article we are going to address the important topic of GSF Development Driller II, which has aroused great interest and debate among specialists and the general public. GSF Development Driller II is a topic that covers various aspects and has significant relevance in today's society. From his impact on politics to his influence on popular culture, GSF Development Driller II has managed to capture the attention of millions of people around the world. Throughout this article, we will explore different perspectives and approaches in relation to GSF Development Driller II, with the aim of providing a comprehensive and enriching vision of this transcendental topic.
History | |
---|---|
Name | GSF Development Driller II |
Owner | Transocean |
Operator | Transocean |
Port of registry | Vanuatu, Port Vila |
Ordered | 2 December 2002 |
Builder |
|
Laid down | 26 May 2003 |
Acquired | 19 February 2005 |
Identification |
|
Status | Operational |
Notes | |
General characteristics | |
Class and type | American Bureau of Shipping: A1, AMS, DPS-2 |
Tonnage | |
Length | 115.7 m (380 ft) |
Beam | 78.68 m (258.1 ft) |
Draught |
|
Depth | 37 m (121 ft) |
Deck clearance | 16,016 m (52,546 ft) |
Propulsion | 8 × 4,300 hp |
Capacity |
|
Crew | 176 |
Notes |
GSF Development Driller II is a fifth generation, Vanuatu-flagged dynamic positioning semi-submersible ultra-deepwater drilling rig owned and operated by Transocean. The vessel is capable of drilling in water depths up to 7,500 ft (2,300 m) with drilling depth of 35,000 ft (11,000 m), upgradeable to 37,500 ft (11,400 m).
Development Driller II was deployed in drilling a relief well on the Macondo Prospect to stop the oil spill caused by the explosion and subsequent loss of Deepwater Horizon.